SH 361 over Redfish Bay and Morris-Cummings Cut |
| Location | Aransas County |
| State | TX |
| Completion Date | 1994 |
| Contact Person | Lloyd M. Wolf P.E. Design Branch Manager Bridge Division Texas Department of Transportation 125 E. 11th Street Austin TX 78701 Phone: (512) 416-2279 Fax: (512) 416-2557 Email: lwolf@dot.state.tx.us |
| Description | This project required construction of two bridges over Redfish Bay (2,020 ft.) and the Morris-Cummings Cut (415 ft.), posing the challenge of over water work on the Texas Gulf Coast. The design included precast piling as well as a precast double-tee superstructure with 44 identical bent caps, which the contractor requested to precast. Bent caps were fabricated in Corpus Christi and used epoxy-coated reinforcing to protect against corrosion in the marine environment. They were transported by barge to the bridge site and then lifted into place over epoxy-coated reinforcing steel hairpin bars embedded in the piling to form the connections. The interface between pile and the bottom of the cap was sealed, and concrete was placed through the slot in the top of the cap to complete the connection. |
| Photo |  |
| Prefabricated Elements | Bent caps |
| Other Keywords | Precast bent caps; precast piling,precast concrete piles/columns,precast deck panels with topping slab,precast pretensioned partial-depth deck panels |
| Advantages | Constructibility: Using precast caps limited the amount of time required for over water work on the Texas Gulf Coast. Minimized Traffic Disruption: Using precast caps reduced project duration by about 40%. |
| Related Document 1 | Precast Bent Caps for SH 361 over Redfish Bay and Morris-Cummings Cut (PDF, 0.5 mb) HTML Version: |
| Photo Credits | Texas Department of Transportation |
|