|
|
PBES Innovative Projects
Illinois Route 29 over Sugar Creek |
| Location | 1 mile east of Springfield, in Sangamon County |
| State | IL |
| Completion Date | 2001 |
| Contact Person | Tom Domagalski P.E. Illinois Department of Transportation Phone: (217) 785-2913 Email: domagalskitj@nt.dot.state.il.us |
| Description | This project required redecking an existing five-span bridge 77.13 meters long. The bridge consisted of a simple-span unit at 12.48 meters, a two-span continuous unit with both at 18.25 meter, and another two-span continuous unit at 12.95 and 12.88 meters. The existing steel beams were reused and made composite with the precast deck panels. The bridge was 11.4 meters wide. The concrete deck panels (f'c = 35 MPa) were 195 millimeters in depth, 11.3 meters in width, and typically 2.5 meters in length. A total of 29 panels were laid across the length of the bridge. Panels used shear keys between the panels and were post-tensioned longitudinally with 25.4-millimeter-diameter high-strength steel bars at 462-millimeter centers. |
| Prefabricated Elements | Decks |
| Other Keywords | Full depth, full width, precast post-tensioned concrete deck panels,precast concrete New Jersey parapets,full-depth deck panels |
| Advantages | Minimized traffic delays by speeding up the construction time, Minimized traffic disruption. |
|
Events
More Information
Contact
Reggie Holt
Office of Bridge Technology
202-366-4596
E-mail Reggie
|
| |
This page last modified on 05/12/08 | |