PBES Innovative Projects

I-65/I-59 Interchange

LocationBirmingham
StateAL
Completion Date2002
Contact PersonFred Conway P.E.
Alabama Department of Transportation
Phone: (334) 242-6007
Email: conwayf@dot.state.al.us
DescriptionWhen a fuel truck collision damaged a Birmingham bridge in the I-65/I-59 interchange, the Alabama Department of Transportation opted for a wider replacement bridge with a longer span over the northbound lanes of I-65, the main north-south route through Alabama. The interchange carries an estimated 100,000 vehicles per day, and the bridge needed to be replaced quickly. For the 140-foot main span and the 75-foot approaches, the contractor proposed a value-engineering girder re-design using AASHTO BT-54 Modified Bulb Tee girders with a 14-day strength of 8,000 psi. Traffic was stopped on I-65 north for only 12 nighttime hours to set the 15 girders on the 140-foot span overhead. Construction was completed in just 37 days.
PhotoPhoto of precast prestressed girders on the I-65/I-59 Interchange bridge. Click image for larger version.
Other Keywordsprecast prestressed girders (long span)
AdvantagesMinimized traffic disruption by reducing construction time and limiting lane closures.
Contract ElementsThe contract time was set at 90 calendar days with a penalty of $25,000 per day for finishing late and a reward of $25,000 per day for finishing ahead of the 90-day deadline.
Photo CreditsAlabama Department of Transportation

Events

More Information

Contact

Reggie Holt
Office of Bridge Technology
202-366-4596
E-mail Reggie

 
 
This page last modified on 05/12/08
 

FHWA
United States Department of Transportation - Federal Highway Administration