Structures

PBES Innovative Projects

I-45/Pierce Elevated

LocationDowntown Houston
StateTX
Completion Date1997
Contact PersonKenneth L. Ozuna P.E.
Texas Department of Transportation
Phone: (713) 802-5435
Email: kozuna@dot.state.tx.us
DescriptionWhen a 113-span section of IH 45 in Houston's central business district needed replacing, designers estimated that a conventional bridge system would require more than a year and a half of construction. Estimating user delay costs at $100,000 a day, TxDOT opted to speed construction by using precast bent caps on the existing columns. The bridge consists of twin structures, one northbound and one southbound, and each structure was completed in 95 days, a total of 226 spans replaced in 190 days. To connect the precast caps to the existing columns, the precast caps were anchored with post-tensioning bars and hardware.
PhotoPhoto of construction on I-45/Pierce Elevated highway. Click image for larger version.
Prefabricated ElementsBent caps; decks
Other KeywordsPrecast bent caps; precast prestressed deck panels; precast prestressed I-beams,precast deck panels with topping slab,precast pretensioned partial-depth deck panels,speed of construction
AdvantagesMinimized traffic disruption: construction time was reduced from an estimated 1.5 years to 190 days, with user delay costs estimated at $100,000/day.
Related Document 1Cap-to-Column Connection Detail Drawings (PDF, 0.5 mb)
HTML Version:
Photo CreditsTexas Department of Transportation

Events

More Information

Contact

Reggie Holt
Office of Bridge Technology
202-366-4596
E-mail Reggie

 
 
This page last modified on 05/12/08
 

FHWA
United States Department of Transportation - Federal Highway Administration